Yunnan Dongsheng Paper 300,000 t/a High-grade Package Paper Project Started Construction
摘要点击次数: 399
全文下载次数: 284
中文摘要:
      The f irst batch of impor tant projec ts of 2015 in Yunnan Yiliang started construction together on March 12th,2015, the total investment of the 9 projec t s was about RMB 1 billion, which including the 300,000 t/a high-grade package paper project invested and constructed by Yunnan Dongsheng Paper Co., Ltd.
Abstract:
      
作者简介:
查看全文  查看/发表评论  下载PDF阅读器

分享按钮